McGranahan Architects
  • Approach
    • Genuine Collaboration
    • Distinct Solutions
    • Transcendent Value
    • Environmental Responsibility
    • Developing Craft
    • Ongoing Legacy
  • Work
    • Early Learning
    • Elementary School
    • Junior / Middle School
    • High School
    • College
    • University
    • Civic and Commercial
  • People
    • Leadership Team
  • Place
    • Careers
    • Culture
    • Contact Us
  • Go to the previous project
  • Go to the next project
Civic and Commercial
  • Early Learning
  • Annette B. Weyerhauser Early Learning Center
  • Elementary School
  • Spiritridge Elementary School
  • Crescent Heights Elementary School
  • Mann Elementary School
  • Medina Elementary School
  • Kennydale Elementary School
  • Junior / Middle School
  • Hunt Middle School
  • Liberty Junior High School
  • Redmond Junior High School
  • High School
  • Timberline High School
  • Sno-Isle TECH Skills Center
  • Lake Washington High School
  • Redmond High School
  • Arlington High School
  • College
  • Health Sciences Facility
  • Communications & Technology Facility
  • Automotive Education & Training Center
  • South Campus Academic Building
  • Sharon McGavick Student Center
  • Cascade Building
  • University
  • Harned Hall
  • University of Washington, Tacoma
  • Civic and Commercial
  • Engineering Offices
  • Point Defiance Zoo
  • Sultan Community Center
  • Bone Dry Shoe Building
  • Clarus Building
  • Department of Ecology Headquarters
  • Environmental Services Building
  • Washington Market
Engineering Offices

Engineering Offices

Client: PCS Structural Solutions
Size: 12,700 sf
Location: Tacoma, WA

PCS completed an extensive re-branding of the 45 year old firm. The client’s challenge to the design team was to create an office design that represented their new brand identity and serve as a showcase for their services.

The area of this tenant improvement included a 5'-6" vertical elevation change that bisects their space. That elevation change was used as a spatial organizational device and helped to create a grand stair that doubles as presentation theater for their in-house professional development events. The design team used a three dimensional representation of the new corporate logo to house principal offices within a red metal box as a central feature element.  PCS wanted the materials that they work with – steel, concrete and wood - used and celebrated in their new space. The design team utilized many materials with intrinsic finishes, provided abundant access to natural light and used reclaimed wood from old parking garage guard rails. The new space is located within a LEED Platinum building shell and core and many sustainable ideas were incorporated into their new space.

2111 Pacific Ave, Suite 100, Tacoma, WA 98402 Phone: 253.383.3084

  • Client Login
  • Firm Profile (PDF)
  • Copyright © 2012 McGranahan Architects, All Rights Reserved.
  • Site Design